Job ID: MS-143518 (90090615)
Remote/Local Oracle Primavera Unifier Administrator (12+) with L1, ASP code maintenance, C#, asp.net, Oracle P6, .Net Core, SQL, MySQL experience
Location: Jackson, MS (DFA)
Duration: 12 Months
Position: 1
Required Skills/Experience
Experience supporting Unifier; experience in design and coding in C # (Sharp); asp.net coding experience
Preferred/Not Required
Examples: Previous supervisory
experience, WebLogic experience helpful, etc.
Experience and Knowledge of Oracle P6
Programming Language/Development Tools
C# Required
Required/Preferred
ASP.NET Required
.NET Core Required
Database Systems/Database Tools
Oracle SQL
Framework/SLD/Methodology
ASP .NET
Position Description and Job Skill Set
Description of the job functions the contractor will be expected to perform.
Maintain and support Oracle Primavera Unifier Version: 21.12.4 and higher; making changes to existing business
processes, data views, user defined reports, BI custom prints, etc. Ability to identify configuration defects and make the
necessary corrections and to assist application administrators with first level user support. Also responsible for
maintaining existing ASP code for the reservations and service requests portals and the DFA Bureau of Buildings
(BOB) project listing web pages.
